torch Projects
CEB Support System
This guide explains the steps for: Leg Holders-Model Feet- Model Legs- Model Secondary Arms- Model Primary Arms- Left Primary Arm Model, Right Primary Arm Model Additional Materials Required: 3/4" Steel...
Posted by Brianna Kufa
Categories: Gardening | No Comments
CEB Hopper Supports and Grate Supports
Hopper Support Model Grate Support Model Additional Materials Required: 3/4"x1.5" Bolts (2) 3/4" Nuts (2) Shaker Mount
Posted by Brianna Kufa
Categories: Gardening | No Comments
Prepare the Hopper Sheet Metal
Sketchup Model Additional Materials Required: Hinges (12) 1/2"x1" Bolts (12) 1/2" Nuts (12) 1/2" Washers (12)
Posted by Brianna Kufa
Categories: Gardening | No Comments
CEB Soil Grate
Sketchup Model Additional Materials Required: Steel Nuts (2)
Posted by Brianna Kufa
Categories: Gardening | No Comments
CEB: Wide Cylinder Supports
Sketchup Model Additional Materials Required: 3/4"x2" Bolts (2) 3/4" Steel Nuts (2) 3/4" Galvanized Nuts (2)
Posted by Brianna Kufa
Categories: Gardening | No Comments
CEB Main Frame: U-Channel Prep
Sketchup Model Additional Materials Required: 3/4" Galvanized Nuts (4) 3/4" Steel Nuts (10)
Posted by Brianna Kufa
Categories: Gardening | No Comments
CEB Leg Holders
We suggest you prepare all leg holders at once, doing each step for all leg holders before moving on.
Posted by Brianna Kufa
Categories: Gardening | No Comments
Soil Loading System
You must have finished assembling the main frame before you install the soil loading system.
Posted by Brianna Kufa
Categories: Gardening | No Comments
CEB Press: Structural Components Assembly
Posted by Brianna Kufa
Categories: Gardening | No Comments
Fitting the Main Cylinder
I really reccomend you watch the instructional video: Sketchup Model You need to fit the cylinder into the frame so that when it is fully extended, the press foot is...
Posted by Brianna Kufa
Categories: Gardening | No Comments


























